We have developed picea in such a way that no permit is required. picea does not require planning permission. To make this possible, the hydrogen storage tank itself must be located outside the house and the regional building regulations stipulating minimum spacing requirements must be complied with on the property. However, these spacing requirements apply to any structure or installation on your property.